BOSCH ME2.1 Pinout

いつもTS用ばかりなので、たまには・・・
EURO2の2.5V6に使われている(と思われる)BOSCH ME2.1のピンアウトです。
この表に関する注意点等はM1.5.5ピンアウトのページと同じです。
B-3に+12Vを繋ぐとプログラミングできるようです。詳細は分かりませんので悪しからず。

AlfaRomeo 156 BOSCH ME2.1 Pinout

Pin LayoutME2.1 Pinout
(Click to Enlarge)
E1operation of injector for cyl. 3
2operation of injector for cyl. 6
3n.c.
4a/c compressor relay feed
5-12n.c.
13operation of injector for cyl. 2
14operation of injector for cyl. 5
15request to engage 1st fan speed
16n.c.
17request to engage 2nd fan speed
18-20n.c.
21a/c request switch
22n.c.
A1lambda sensor 2 heater (only for automatic)23n.c.
2supply24n.c.
3ignition earth25operation of injector for cyl. 1
4n.c.26operation of injector for cyl. 4
5lambda sensor heater27n.c.
6relay for 1st fan speed28coolant temperature sensor earth
7ignition earth29coolant temperature sensor signal
8electronic earth for sensors30n.c.
B1n.c.31potentiometer - 1 buttery casing
2n.c.32earth for potentiometer 1-2 butterfly casing
3programming33supply for potentiometer 1-2 butterfly casing
4battery34potentiometer - 2 buttery casing
C1-20n.c.35n.c.
21fuel vapor recovery solenoid valve36n.c.
22supply for potentiometer - 1 accelerator pedal37rpm sensor (+)
23earth for potentiometer - 1 accelerator pedal38rpm sensor (-)
24signal for potentiometer - 1 accelerator pedal39timing sensor earth
25signal for potentiometer - 2 accelerator pedal40timing sensor signal
26earth for potentiometer - 2 accelerator pedal41earth for detonation sensor 1 (cyl. 1,4,5)
27supply for potentiometer - 2 accelerator pedal42signal for detonation sensor 1
28n.c.43earth for detonation sensor2 (cyl. 2,3,6)
29fuel pump relay44signal for detonation sensor 2
30n.c.45air temperature sensor
31lambda sensor earth46flow meter - reference voltage 5V
32lambda sensor signal47output voltage (signal) - flow meter
33lambda 2 probe signal (only for automatic)48earth - flow meter
34lambda 2 probe earth (only for automatic)F1throttle body motor integrated with D.V.E.
35-37n.c.2throttle body motor integrated with D.V.E.
38rpm signal3n.c.
39diagnostic connection (K line)4n.c.
40n.c.5operation of ignition coil for cyl. 6
D1n.c.6operation of ignition coil for cyl. 2
2n.c.7n.c.
3relay for cooling fan 2nd speed8earth
4-10n.c.9-12n.c.
11CAN line "high"13operation of ignition coil for cyl. 4
12CAN line "low"14n.c.
13speedometer signal15n.c.
14brake lights switch16n.c.
15-16n.c.17operation of ignition coil for cyl. 3
17automatic transmission recognition18n.c.
18n.c.19operation of ignition coil for cyl. 5
19clutch pedal switch20operation of ignition coil for cyl. 1
20-24n.c.21operation of ignition warning light


目次へ戻る             「BOSCH M1.5.5 Pinout」へ             「BOSCH ME3.1 Pinout」へ